Skip to main content
European Commission logo
European Commission
  • Project

Renovation of Bertinetti Elementary School

School building security and structural rehabilitation plan (Mission 4 – Component 1 - Investment 3.3)

Italy’s Recovery and Resilience Plan contributes to climate recovery also by enhancing school buildings’ safety and energy consumption. In particular, this measure aims to contribute to the improvement of energy classes and leading to lower consumption and CO2 emissions as well as to increase structural safety of buildings. Particular attention is paid to the most disadvantaged areas with the aim of tackling and eliminating economic and social imbalances.

The investment is financed by Italy’s Recovery and Resilience plan by EUR 4.4 billion.

The project “Renovation of Bertinetti Elementary School” is part of this investment.

The goal of the project is the seismic retrofitting of the building with local reinforcement measures aimed at increasing and improving the resistance of the existing building under the effect of seismic actions. It also includes interventions aimed at removing architectural barriers to make all levels of the structure accessible to people with reduced mobility, such as the installation of a new external elevator; and other interventions aimed at improving the energy efficiency of the building through measures on water and sanitation, electrical, photovoltaic, and thermal systems.

The cost of the project is financed by Italy’s Recovery and Resilience plan with EUR 2.4 million. In addition,  EUR 277.000 allocated by the Italian government to address the increase in raw material costs, and approximately EUR 453.000 provided by the municipal administration.

Top 100 recipients:

  • COMUNE DI TORINO