Copyright: Città metropolitana di Torino School building security and structural rehabilitation plan (Mission 4 – Component 1 - Investment 3.3)Italy’s Recovery and Resilience Plan contributes to climate recovery also by enhancing school buildings’ safety and energy consumption.In particular, this measure aims to contribute to the improvement of energy classes and leading to lower consumption and CO2 emissions as well as to increase structural safety of buildings.Particular attention is paid to the most disadvantaged areas with the aim of tackling and eliminating economic and social imbalances.The investment is financed by Italy’s Recovery and Resilience plan by EUR 4.4 billion.The project is part of this investment.The school building, owned by the Metropolitan City of Turin, is located in Chivasso in Via F. Ajma, 12.The school building consists of two adjacent and interconnected buildings, built at different times.The property is divided into main building (year 1978) and expansion (year 2001) separate you from a 3 cm technical joint.The intervention will consist essentially of interventions on the load-bearing structures and foundations in order to achieve the seismic adjustment of the structural units US1, US2 and US5.With the structural consolidation works, an improvement of the seismic response as defined in points 8.3 and 8.4.3 of the NTC 2018 and C8.4.3 of Circular no. 617 of 2019 was achieved.It will also proceed with architectural and plant restoration dictated by structural interventions as well as works aimed at solving some functional problems and improving energy performance.Top 100 recipients:CITTÀ METROPOLITANA DI TORINO Copyright: Città metropolitana di Torino ReferenceM4C1Project locations Italy EU contribution€4 400 000 000