Copyright: Electricity Authority Cyprus The objective of the measure C2.1I5 is to facilitate the energy upgrading and increased energy efficiency of selected public buildings, including the setting up and installation of photovoltaics system at the Nicosia General Hospital (sub-measure 2 - C2.1I5c - Target #36).The investment concerning the Nicosia General Hospital consists in the setting up and installation of photovoltaics system at the Nicosia General Hospital of a total capacity of 943 KW.The implementation has been completed and the taking over certificate was issued in November, 2024.Additional link: https://enimerosi.moec.gov.cy/ypp16660https://enimerosi.moec.gov.cy/ypp16627https://www.pveurope.eu/financing/southern-europe-cyprus-rooftop-pv-sys…Top 100 recipientsMinistry of Education, Sport and Youth Copyright: State Health Services Organisation Copyright: State Health Services Organisation ReferenceC2.1I5b in the Cypriot Recovery and Resilience PlanProject locations Cyprus EU contribution€7 300 000