Plan for the extension of fulltime (Mission 4 – Component 1 Investment 1.2)Italy’s Recovery and Resilience Plan provides for the extension of school time, in order to increase the educational offer of schools and make them open and available to the territory beyond school hours. The measure envisages the construction or renovation of canteen spaces for at least 1 000 structures to allow for the extension of school time. Extended schooling hours are expected to have a positive impact on the fight against early school leaving.The investment is financed by Italy’s Recovery and Resilience plan by EUR 1 billion.The project Construction of a school canteen to serve the schools of Falerna Scalo is part of this investment. The project aims at the construction of a school canteen that will be built in the lot currently used as a public park, so as to implement the services available to school principals present. This therefore represents an improvement in the school life of users from a food and physical point of view.The interventions to be carried out will be multiple as the following phases will be necessary:Construction of the areaPreparation of construction site area (Demolition of a wooden structure and foundation base;Dismantling of children’s games; cleaning of work area)Excavation and stripping;Structural works (AC foundations; supporting structure (pillars, beams and roof slab);External and internal tompaging;Plant engineering works;Installation of windows and windows;Finishing works.All the interventions will be realized in the full respect of the enforced norms in matter of safety in the construction sites, trying in its turn to bring least possible discomfort to the citizens. ReferenceM4C1Project locations Italy EU contribution€1 000 000 000