Copyright: MAVIR.Zrt The project aims to increase the transmission capacity of the transmission network by increasing the capacity of several substations by 400 kV and increasing the load capacity of some 220 kV transmission lines. The project will result in a significant increase in the number of weather-dependent renewable electricity generating units that can potentially be connected to the transmission grid. The project is supported by EUR 6 835 634 from the Recovery and Resilience Facility. It will be completed by 30 April, 2026.Additional links:https://www.mavir.hu/hu/web/mavir/alallomasok-kapacitasanak-es-220kv-os-tavvezetekek-terhelhetesegenek-novelesehttps://www.facebook.com/100063684697591/posts/pfbid0swep4jWFt89LgUvvhSu8H1s5xMRkqf39FymBm9CLoGtc7T4FcKKz9qwfqxBHyBuHl/?d=nhttps://www.facebook.com/watch/?v=1120022392749947&extid=NS-UNK-UNK-UNK-IOS_GK0T-GK1C&ref=sharingTop 100 Recipients4. MAVIR Magyar Villamosenergia-ipari Átviteli Rendszerirányító Zártkörűen Működő Részvénytársaság Copyright: MAVIR Zrt. Copyright: MAVIR Zrt. Copyright: MAVIR Zrt. ReferenceC6.I1 - C10.I1 in the HU Recovery and Resilience PlanProject locations Hungary EU contribution€6 835 634 Project websitehttps://www.mavir.hu/hu...