Skip to main content
Project

Inland waterway energy transition

Inland waterway energy transition Netherlands
Copyright: ZES – All rights reserved

 This investment has the purpose of deploying fully electric, zero-emission inland waterway transport. In total, this includes 75 Modular Energy Containers, 14 loading sites for vessels and 45 fully electric inland waterway vessels. The programme also makes electric sailing more affordable for the vessel-owners.

The project is expected to be completed by the end of 2025. The first electric, zero-emission vessel is already in use. This vessel, called ‘De Alphenaar’, sails between Alphen aan den Rijn en Moerdijk.

European Commission President Ursula von der Leyen visited the project on 8 September 2022, on the occasion of the approval of the Dutch Recovery and Resilience Plan.

More information can be found at the links below:

picture_vdl_and_pm_rutte
Commission President Ursula von der Leyen presents the Commission’s assessment of the original plan to Prime Minister Rutte during a visit in the Netherlands on 8 September 2022.